Overview

The development

Lurion Residences is located in Oliveira do Douro, Vila Nova de Gaia, and is developed by REVITO.

The building comprises a total of 73 residential units, ranging from studio (T0) to T4 duplex. As of October–November 2026, construction was in the interior works stage.

Official developer website

Full institutional and commercial information on the development is published on the official website of REVITO — the developer of Lurion Residences, independent from VERNAX.

Images: REVITO

Development renders

Exterior facade render of the Lurion Residences development
Exterior facade
Garden and outdoor pool render of Lurion Residences
Garden and outdoor pool
Rooftop and pool render overlooking the Douro river
Rooftop and pool
Residential interior space render of Lurion Residences
Interior space

Images: REVITO (lurionresidences.com)

Images: REVITO

Construction progress

Chronological construction record based on REVITO's monthly newsletters, from February to November 2026.

  1. Structure underway

    Construction of the first-floor structure.

    Lurion Residences site on 4 February 2026: level 1 structure underway
  2. Level 2 and 3 slabs

    Progress of the structural slabs on the intermediate floors.

    Lurion Residences site on 6 March 2026: level 2 and 3 slabs
  3. Top floor

    Structural work on the top floor of the building.

    Lurion Residences site on 10 April 2026: top floor under construction
  4. Structure completed

    Completion of the reinforced concrete structure.

    Lurion Residences site on 12 May 2026: structure completed
  5. Facade masonry

    Start of exterior masonry works.

    Lurion Residences site on 12 June 2026: facade masonry
  6. Facade progress

    Continued exterior enclosure works.

    Lurion Residences site on 3 July 2026: facade progress
  7. Masonry completed

    Completion of the building's facade masonry.

    Lurion Residences site on 7 August 2026: masonry completed
  8. Interiors underway

    During September and October, interior works progressed with plasterboard partitions, electrical and plumbing installations, and balcony screed. As of October–November 2026, interior works remained underway.

Images: REVITO (monthly newsletters, Feb–Aug 2026)